This project is working with a major Nigerian vehicle leasing company to install six PV systems ranging from 150 to 450 kW and cumulative of about 2 MW, with minimal electrical storage systems (ESS). This project will be implemented in three phases.

In addition, the project will improve energy efficiency in each of the company’s offices in Nigeria. The aim is to reduce energy consumption by 40-50% over a two-year period, from its current consumption of nearly approximately 2,000,000 kWh per year. The company’s carbon footprint will be reduced by about 824,100 kg CO2e per year, and the aim is for the company to achieve carbon-neutrality in its activities within two years.