This project will design, construct and operate a 5 MW solar photovoltaic (PV) power plant as well as 1 km of 22 kV transmission line in Lao PDR, near the capital of Vientiane. The electricity produced, approximately 7,408,400 kWh per year, will be sold to the Lao national power utility (Électricité du Laos; EDL) and to a local cassava factory.

An HSPP project feasibility study has been completed, and a Power Purchase Agreement has been closed with EDL. A 10 hectare site for the plant has been identified near the cassava factory.